Circutor AFQ Series Manuale Utente Pagina 80

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 106
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 79
AFQ-4W
80 Instruction Manual
Figure 92: Unscrew the turbine fasteners
20.- Replace the turbine with the spare.
21.- Reinsert the pack into the cabinet.
22.- Fix the extractor hood.
23.- Connect the turbine power supply.
24.- Connect the R-S-T phases to the inverter bridge.
25.- Put the NTC probe cable back in the channel.
26.- Connect the NTC probe.
27.- Connect the IGBTs to the driver board and reinstall the driver board if
necessary.
Respect the R-S-T order of the connectors.
28.- Connect the DC bus busbar.
29.- Insert the top crossbar of the AFQ-4W cabinet.
30.- Connect the earth wire to the front panel metal plate of the AFQ-4W.
31.- Fit the protection board.
32.- Check that the turbine operates correctly.
Vedere la pagina 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 105 106

Commenti su questo manuale

Nessun commento